Name |
Date |
Download |
Gare Palma IV 8 -EC Half Yearly Compliance Report_April 2024 to Sep 2024 |
March 18, 2025 |
 |
EC 2020 Compliance Status Ambuja Cement Nalagarh NOV 2024 |
February 15, 2025 |
 |
EC 2008 Compliance Status Ambuja Cement Nalagarh NOV 2024 |
February 15, 2025 |
 |
EC Half Yearly Compliance Report Rawan Limestone Mine( April_24 to Sept_24) |
December 13, 2024 |
 |
EC Half Yearly Compliance Report Maldi Mopar Limestone Mine_ April 24-to Sept 24 |
December 13, 2024 |
 |
EC Half Yearly Complinace _Integrated Cement Plant_ April-24 to Sept-24 |
December 13, 2024 |
 |
EC Half Yearly Compliance Report Line-03_Report-April-24 to Sept-24 |
December 13, 2024 |
 |
EC compliance Report - Maratha Limestone Mine (ML-III) April 2024 to September 2024 |
December 10, 2024 |
 |
EC Compliance Report - Nandgoan Ekodi Limestone Mine (April 2024 to Sept 2024) By Ambuja Cement Ltd. |
December 10, 2024 |
 |
EC Compliance report (April 24 to Sept 24) for Maratha Limestone Mine (ML-I) by Ambuja Cement Ltd |
December 10, 2024 |
 |
EC compliance report (April 24 to Sept 24) for Maratha Limestone Mine (ML-II) by Ambuja Cement Ltd. |
December 10, 2024 |
 |
EC Compliance Report Cement Plant April 24 to Sept 24 |
December 10, 2024 |
 |
EC compliance April, 24 to September 24 |
November 30, 2024 |
 |
EC Compliance Sankrail expansion 2.4 MTPA to 4.0 MTPA - Apr 24 to Sep 24 |
November 29, 2024 |
 |
EC Compliance Sankrail 2.4 MTPA - Apr 24 to Sep 24 |
November 29, 2024 |
 |
Gajambuja EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
TPP EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
BCT-Muldwarka EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
Sugala EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
Vadnagar EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
Singsar EC Compliance (April'24 Sept'24) |
November 27, 2024 |
 |
RKBA EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
Lodhva EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
Solaj EC Compliance (April'24-Sept'24) |
November 27, 2024 |
 |
EC Half Yearly Complinace Integrated Cement Plant April 24 to Sept 24 |
November 27, 2024 |
 |
EC Half Yearly Compliance Report Line-03 Report April 24 to Sept 24 |
November 27, 2024 |
 |
EC Half Yearly Compliance Report Maldi Mopar Limestone Mine April-24 to Sept-24 |
November 27, 2024 |
 |
EC Half Yearly Compliance Report Rawan Limestone Mine( April_24 to Sept_24) |
November 27, 2024 |
 |
Ambuja Rabriyawas Environmental Clearance Nov. 2024 |
November 08, 2024 |
 |
Ambuja Suli Environment Statement 23-24 |
November 06, 2024 |
 |
Ambuja Rauri Environment Statement 23-24 |
November 06, 2024 |
 |
Ambuja Bathinda Environment Statement Report (Form-V) for FY 2023-24 |
October 01, 2024 |
 |
Ambuja Maratha NE Mine - Half Yearly EC Report October 23 to March 24 |
September 26, 2024 |
 |
Maratha Cement Works BMW Return 2023 |
September 26, 2024 |
 |
Ambuja Maratha ML III Mine - Half Yearly EC Report October 23 to March 24 |
September 26, 2024 |
 |
Ambuja Maratha ML II Mine Half Yearly EC Report October 23 toMarch24 |
September 26, 2024 |
 |
Ambuja Maratha ML I Mine - Half Yearly EC Report October 23 to March 24 |
September 26, 2024 |
 |
Bathinda expansion - EC Letter - July'24 |
July 20, 2024 |
 |
Ropar Half Yearly EC Compliance Oct'23 to Mar'24 |
July 18, 2024 |
 |
Gare Palma Six monthly EC Compliance Oct 23 to march 24 |
June 01, 2024 |
 |
Bhatapara Rawan Limestone Mine EC Compliance(Oct 2023 - March 2024) |
May 27, 2024 |
 |
Bhatapara Maldi Mopar Limestone Mine EC Compliance(Oct 2023 - March 2024) |
May 27, 2024 |
 |
Bhatapara Line 03 EC Complinace Line 3(Oct 2023 - March 2024) |
May 27, 2024 |
 |
Bhatapara Cement Plant EC Compliance (Oct 2023 - March 2024) |
May 27, 2024 |
 |
Kashlog Mines MoEF Compliance Oct 23 to March 24, 7.6 MTPA |
May 22, 2024 |
 |
Suli MoEF Compliance Oct 23 to March 24 - 2.6 MTPA |
May 22, 2024 |
 |
Rauri MoEF Compliance Oct 23 to Mar 24 - 2.6 MTPA |
May 22, 2024 |
 |
RKBA Half Yearly Compliance Oct23-Mar24 |
May 22, 2024 |
 |
Singsar Half Yearly Compliance From Oct23-Mar24 |
May 22, 2024 |
 |
Solaj Half Yearly Compliance Oct23-Mar24 |
May 22, 2024 |
 |
Sugala Half Yearly Compliance Oct23-Mar24 |
May 22, 2024 |
 |
TPP Half Yearly Compliance Oct23-Mar24 |
May 22, 2024 |
 |
Vadnagar Half Yearly Compliance Oct23-mar24 |
May 22, 2024 |
 |
BCT Half Yearly Compliance From Oct23-Mar24 |
May 22, 2024 |
 |
GAJ Half Yearly Complience From Oct23-Mar24 |
May 22, 2024 |
 |
Lodhva Half Yearly Compliance Oct23-Mar24 |
May 22, 2024 |
 |
Ambuja Bhatapara - Hazardous Waste NOC for Co-Processing in Kiln |
April 02, 2024 |
 |
Annual Biomedical Report 2022 |
March 01, 2024 |
 |
EC letter of Maratha Expansion_Feb, 2024 |
February 20, 2024 |
 |
Ambujanagar Vadnagar SNo.44 Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar Thermal Power Plant Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar Sugala Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar Solaj Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar Singsar Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar RKBA Limestone Mines Six Monthly Compliance Report Octr 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar Lodhva Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar Gaj Ambuja Cement Plant Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar BCT RO Plant Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambujanagar BCT Muldwarka Six Monthly Compliance Report Oct 22 to March 23 |
January 24, 2024 |
 |
Ambuja Suli - Half Yearly EC Report April 23 to September 23 |
December 01, 2023 |
 |
Ambuja Rouri - Half Yearly EC Report April 23 to September 23 |
December 01, 2023 |
 |
Ambuja Kashlog Mines - Half Yearly EC Report April 23 to September 23 |
December 01, 2023 |
 |
Ambuja Maratha NE Mines - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Maratha ML III Mine - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Maratha ML II Mine - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Maratha ML I Mine - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Maratha Cement Plant - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Bhatapara Rawan Mines - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Bhatapara Plant Line 3 - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Bhatapara Maldi Mopar Mines - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Ambuja Bhatapara Cement Plant - Half Yearly EC Report April 23 to September 23 |
November 30, 2023 |
 |
Gare Palma IV8 Coal Mine Six Monthly EC (Mine) Compliance Report April 23 to September 23 |
November 16, 2023 |
 |
EC Compliance Report for ACL-Ropar |
August 29, 2023 |
 |
EC Letter of Sankrail Expansion |
July 22, 2023 |
 |
EC letter of Marwar Limestone mine (ML-II) expansion _30 June, 2023 |
July 14, 2023 |
 |
Gare Palma IV8 Coal Mine Six Monthly EC (Mine) compliance report July 22 to Dec 22 |
June 23, 2023 |
 |
Sankrail_EC compliance from Oct'22 to Mar'23 |
June 19, 2023 |
 |
Farakka-Six Month Compliance Report from Oct 2022 to Mar 2023 |
June 19, 2023 |
 |
Nalagarh Half Yearly Compliance of Environmental Clearance (April 2020) from October 2022 to March 2023 |
June 19, 2023 |
 |
Nalagarh Half Yearly Compliance of Environmental Clearance (August 2008) from October 2022 to March 2023 |
June 19, 2023 |
 |
Kashlog Mines 5.5 MTPA compliance April 2022 to Oct 2022 |
May 26, 2023 |
 |
Kashlog mines expansion 7.6 - EC Compliance April 2022 to Sep 2022 |
May 26, 2023 |
 |
Rauri Plant_1.8 MTPA_Compliance April 2022 to Sep 2022 |
May 26, 2023 |
 |
Suli Plant_EC_Compliance April 2022 to Sep 2022 |
May 26, 2023 |
 |
Rauri Plant_2.6 MTPA_Compliance report_April 2022 to Sep 2022 |
May 26, 2023 |
 |
Ambujanagr Sugala Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagr Lodhva Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagr BCT RO Plant Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagr BCT Muldwarka Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagar Vadnagar (SNo.44) Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagar Thermal Power Plant Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagar Solaj Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagar Singsar Limestone Mines Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ambujanagar RKBA Limestone Mines Six Monthly Compliance Report Octr 22 to March 23 |
May 23, 2023 |
 |
Ambujanagar Gaj Ambuja Cement Plant Six Monthly Compliance Report Oct 22 to March 23 |
May 23, 2023 |
 |
Ropar unit BMW generation report - June 2022 to Feb 2023 |
March 06, 2023 |
 |
Farakka Six Monthly EC Compliance Report (Apr-Sept'22) |
December 19, 2022 |
 |
EC Half Yearly Compliance Report Cement Plant ( April 2022- September 2022) |
November 29, 2022 |
 |
EC Half Yearly Compliance Report Rawan Mine ( April 2022- September 2022) |
November 29, 2022 |
 |
EC Half Yearly Compliance Report Maldi Mine ( April 2022- September 2022) |
November 29, 2022 |
 |
Ropar_Half Yearly Compliance of Environmental Clearance_April 2022 to September 2022 |
November 23, 2022 |
 |
ACL Sankrail - Six Monthly EC Compliance Report (April'22 to Sept'22) |
November 21, 2022 |
 |
Ambujanagr BCT RO Plant Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagr BCT Muldwarka Six Monthly Compliance Report Apr 22 to Sep_22 |
November 18, 2022 |
 |
Ambujanagar Vadnagar (SNo.44) Limestone Mines Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagar Thermal Power Plant Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagar Solaj Limestone Mines Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagar Singsar Limestone Mines Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagar RKBA Limestone Mines Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagar Gaj Ambuja Cement Plant Six Monthly Compliance Report Apr 22 to Sep_22 |
November 18, 2022 |
 |
Ambujanagr Lodhva Limestone Mines Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
Ambujanagr Sugala Limestone Mines Six Monthly Compliance Report Apr 22 to Sep 22 |
November 18, 2022 |
 |
EC Lettter Bhatapara Expansion_Clinker 8.1 MTPA _ Cement 6.5 MTPA _ WHRS 43 MW DATED 31.10.2022 |
October 31, 2022 |
 |
MARWAR MUNDWA ESR REPORT FORM- V FOR LS MINES ML-II - AMBUJA CEMENT LTD- FY 2021-22 |
September 29, 2022 |
 |
MARWAR MUNDWA ESR REPORT FORM- V FOR LS CRUSHER ML-I - AMBUJA CEMENT LTD- FY 2021-22 |
September 29, 2022 |
 |
MARWAR MUNDWA ESR REPORT FORM- V FOR WTP 3.0 MLD MATASUKH - AMBUJA CEMENT LTD- FY 2021-22 |
September 28, 2022 |
 |
MARWAR MUNDWA ESR REPORT FORM- V FOR LS MINES ML-I M-S AMBUJA CEMENT LTD- FY 2021-22 |
September 28, 2022 |
 |
MARWAR MUNDWA ESR REPORT FORM- V FOR CEMENT PLANT - AMBUJA CEMENT LTD- FY 2021-22 |
September 28, 2022 |
 |
Gare Palma IV-8 Coal Mine Environment Statement for FY 2020-21 |
September 12, 2022 |
 |
Gare Palma IV-8 Coal Mine Environment Statement for FY 2021-22 |
September 12, 2022 |
 |
BMW Generation Report for June, July and August 2022 of Ropar Unit |
September 01, 2022 |
 |
BMW Generation Report of Darlaghat Unit July 2022 |
August 02, 2022 |
 |
Gare Palma IV/8 Coal Mine Six Monthly EC (Washery) compliance report Jan 22 to June 22 |
July 28, 2022 |
 |
Gare Palma IV/8 Coal Mine Six Monthly EC (Mine) compliance report Jan 22 to June 22 |
July 28, 2022 |
 |
BMW Generation Report of Darlaghat Unit June 2022 |
July 10, 2022 |
 |
Ras-1 Mine- Environment Clearance |
June 29, 2022 |
 |
Sankrail Grinding Unit-EC compliance report -Oct'21 to Mar'22 |
June 23, 2022 |
 |
BMW Generation Report of Darlaghat Unit May 2022 |
June 07, 2022 |
 |
Marwar Mundwa Half Yearly EC Compliance report -Lime Stone Mine ML-II -Oct 2021 to Mar 2022 |
May 30, 2022 |
 |
Marwar Mundwa Half Yealy EC Compliance report -Lime Stone Mine ML-I -Oct-2021 to Mar-2022 |
May 30, 2022 |
 |
Marwar Mundwa Half Yearly EC Compliance Report-Cement Plant-Oct 2021-March2022 |
May 30, 2022 |
 |
MCW Six monthly EC compliance report of Cement Plant & CPP for the period oct21 to mar22 |
May 28, 2022 |
 |
MCW Six monthly EC compliance report of Limestone mine ML III for the period oct21 to mar22 |
May 28, 2022 |
 |
MCW Six monthly EC compliance report of Limestone mine ML II for the period oct21 to mar22 |
May 28, 2022 |
 |
MCW Six monthly EC compliance report of Limestone mine ML I for the period oct21 to mar22 |
May 28, 2022 |
 |
ACL Farakka Six Monthly EC Compliance Report (Oct'21 - March'22) |
May 28, 2022 |
 |
Ambujanagr Sugala Limestone Mines Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagr Lodhva Limestone Mines Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagr BCT RO Plant Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagr BCT Muldwarka Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagar Vadnagar (SNo.44) Limestone Mines Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagar Thermal Power Plant Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagar Singsar Limestone Mines Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagar RKBA Limestone Mines Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Ambujanagar Gaj Ambuja Cement Plant Six Monthly Compliance Report Oct 21 to March 22 |
May 26, 2022 |
 |
Rabriyawas Ras-2 Mine - Half Yearly EC Compliance - Oct 2021 - Mar 2022 |
May 25, 2022 |
 |
Rabriyawas Ras-1 Mine- Half Yearly EC Compliance- Oct 2021 - Mar 2022 |
May 25, 2022 |
 |
Rabriyawas Cement Plant and CPP - Six Monthly EC Compliance - Oct 2021 - Mar 2022 |
May 25, 2022 |
 |
Ropar Half Yearly Compliance of Environmental Clearance October 2021 to March 2022 |
May 25, 2022 |
 |
Bhatapara_EC 2.0 MTPA _Maldimopar Limestone Mine Compliance Report ( OCT 2021- MAR 2022 ) |
May 16, 2022 |
 |
Bhatapara_EC 4.8 MTPA _Cement Plant Compliance Report ( OCT 2021- MAR 2022 ) |
May 16, 2022 |
 |
Bhatapara_EC 6.31 MTPA _Rawan Limestone Mine Compliance Report ( OCT 2021- MAR 2022 ) |
May 16, 2022 |
 |
BMW Generation Report of Ropar Unit - April and May 2022 |
May 01, 2022 |
 |
BMW Generation Report of Darlaghat Unit Jan to Dec 2021 |
January 27, 2022 |
 |
Half yearly Compliance on EC granted to GPIV/8 Coal Mine of M/s Ambuja Cement Ltd |
January 07, 2022 |
 |
Half yearly Compliance on EC granted to -1.8MTPA wet washary at GPIV/8 Coal Mine of M/s Ambuja Cement Ltd |
January 07, 2022 |
 |
BMW generation report of December 2021 of Ropar Unit |
January 01, 2022 |
 |
Ropar Unit -BMW generation report of Oct & Nov'2021 |
December 01, 2021 |
 |
Suli Unit EC compliance April 2021 to Sep 2021 |
November 27, 2021 |
 |
Kashlog Mines EC compliance 5.5 to 7.6 MTPA April 2021 to Sep 2021 |
November 26, 2021 |
 |
Kashlog Mines EC compliance 3.3 to 5.5 MTPA April 2021 to Sep 2021.pdf |
November 26, 2021 |
 |
Rauri Unit EC compliance 1.8 MTPA April 2021 to Sep 21.pdf |
November 26, 2021 |
 |
Rauri Unit EC compliance 2.6 MTPA April 2021 to Sep 21 |
November 26, 2021 |
 |
Nalagarh Half Yearly Compliance of EC-1.5MTPA-Apr-Sept 2021 |
November 24, 2021 |
 |
Nalagarh Half Yearly Compliance of EC-1.5 to 2.2 MTPA-Apr-Sept 2021 |
November 24, 2021 |
 |
Ambujanagar Vadnagar S No 44 Limestone Mines Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar Thermal Power Plant Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar Sugala Limestone Mines Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar Solaj Limestone Mines Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar Singsar Limestone Mines Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar BCT Muldwarka Six-Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar BCT RO Plant Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar Gaj Ambuja Cement Plant Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar Lodhva Limestone Mines Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
Ambujanagar RKBA Limestone Mines Six Monthly Compliance Report April 21 to Sep 21 |
November 06, 2021 |
 |
BMW Generation report of Suli, Darlaghat - September & October 2021 |
November 02, 2021 |
 |
Ropar Half Yearly Compliance Report of Environment Clearance - April to September 2021 |
October 28, 2021 |
 |
BMW Generation report of Ropar Unit September 2021 |
October 01, 2021 |
 |
Environmental Statement Report Ropar Unit for the period from April 2020 to March 2021 |
September 27, 2021 |
 |
BMW Generation Report of Darlaghat Unit - July and August 2021 |
September 02, 2021 |
 |
BMW Generation Report - August 2021 of Ropar Unit |
September 01, 2021 |
 |
BMW Generation Report of Ropar Unit - July. 2021 |
August 01, 2021 |
 |
Gare Palma IV-8 Coal Washery EC Compliance Report-Jan-June 2021 |
July 19, 2021 |
 |
Gare Palma IV-8 Coal Washery EC Compliance for July-Dec2020 |
July 16, 2021 |
 |
Gare Palma IV-8 Coal washery EC Compliance for Jan-June2020 |
July 16, 2021 |
 |
Half Yearly Compliance Report of Environment Clearance for Ropar Unit January 2021 to June 2021 |
July 14, 2021 |
 |
Gare Palma IV-8 Coal Mines-EC Compliance Report-Jan-June21 |
July 14, 2021 |
 |
Darlaghat Bio Medical Waste Report of June 2021 |
July 08, 2021 |
 |
Darlaghat Bio Medical Waste of April & May 2021 |
June 12, 2021 |
 |
BMW Generation Report of Ropar Unit - May. 2021 |
June 01, 2021 |
 |
Bhatapara Half Yearly EC Compliance Report of Cement Plant for the period of ( October 2020 - March 2021) |
May 28, 2021 |
 |
Bhatapara Half Yearly EC Compliance report of Maldi Mines for the period of ( October 2020 - March 2021) |
May 28, 2021 |
 |
Bhatapara Half Yearly EC Compliance report of Rawan Mines for the period of ( October 2020 - March 2021) |
May 28, 2021 |
 |
Farakka Six Monthly EC Compliance report Oct'20 to March'21 |
May 26, 2021 |
 |
Ambujanagar Gaj Ambuja Cement Plant Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagr Sugala Limestone Mines Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagr Lodhva Limestone Mines Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagr BCT RO Plant Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagr BCT Muldwarka Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagar Vadnagar (S No. - 44) Limestone Mines Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagar Thermal Power Plant Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagar RKBA Limestone Mines Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagar Singsar Limestone Mines Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Ambujanagar Solaj Limestone Mines Six Monthly Compliance Report Oct 20 to March 21 |
May 17, 2021 |
 |
Half Yearly Compliance Report of Environment Clearance for Capacity Expansion of Nalagarh - October 2020 to March 2021 |
May 08, 2021 |
 |
Half Yearly Compliance Report of Environment Clearance of Nalagarh - October 2020 to March 2021 |
May 08, 2021 |
 |
Cement Plant Rabriyawas & CPP 18 MW for period Oct 2020- March 2021_ Ambuja Cements Limited, Unit- Rabriyawas |
April 15, 2021 |
 |
Ras-II Mines for period Oct 2020- March 2021_Ambuja Cements Limited, Unit-Rabriyawas |
April 15, 2021 |
 |
Ras-I Mines of Ambuja Cements Ltd. Rabriyawas for period Oct 2020-March 2021 Six monthly EC compliance report |
April 15, 2021 |
 |
BIO-Medical Waste Report Mar 2021 |
April 06, 2021 |
 |
BMW generation report- March 2021 of Ropar Unit |
April 01, 2021 |
 |
BIO-Medical Waste Report Feb 2021 |
March 02, 2021 |
 |
BMW generation report- Jan & Feb. 2021 of Ropar Unit |
March 01, 2021 |
 |
BIO-Medical Waste Report Jan 2021 |
February 04, 2021 |
 |
Gare Palma IV-8 Coal Mines Half-Yearly EC Compliance report July - Dec 2020 |
January 29, 2021 |
 |
Ambuja Darla Bio-Medical Waste Jan 21 |
January 07, 2021 |
 |
Bhatapara Occupational Health Center - Form-IV January-December 2020 |
January 04, 2021 |
 |
Ropar Unit BMW generation report- December 2020 |
January 01, 2021 |
 |
Farakka GU-Six monthly EC compliance-April-Sept 2020 |
November 27, 2020 |
 |
Rauri Unit EC compliance MoEF 1.8 to 2.6 MTPA April 2020 to Sep 2020 |
November 27, 2020 |
 |
Kashlog Mines EC compliance 5.5 to 7.6 April 2020 to Sep 2020 |
November 27, 2020 |
 |
Kashlog Mines EC compliance 3.3 to 5.5 MTPA April 2020 to Sep 2020 |
November 27, 2020 |
 |
Rauri Unit EC compliance 1.8 MTPA April 2020 to Sep 2020 |
November 27, 2020 |
 |
Suli Unit MoEF six monthly Apr 2020 to Sep 2020 |
November 27, 2020 |
 |
MCW Six monthly EC compliance report of Limestone mine ML I for the period Apr20 to Sep20 |
November 27, 2020 |
 |
MCW Six monthly EC compliance report of Limestone mine ML II for the period Apr20 to Sep20 |
November 27, 2020 |
 |
MCW Six monthly EC compliance report of Limestone mine ML III for the period Apr20 to sep20 |
November 27, 2020 |
 |
MCW Six monthly EC compliance report of Cement Plant & CPP for the period Apr20 to Sep20 |
November 27, 2020 |
 |
Nalagarh-Half Yearly Compliance Report of Environment Clearance Expansion-April to Sept 2020 |
November 26, 2020 |
 |
BCT Mangalore-CRZ Clearance-Compliance report Apr 2020 to Sept 2020 |
November 23, 2020 |
 |
Nalagarh-Half Yearly Compliance Report of Environment Clearance-April to Sept 2020 |
November 23, 2020 |
 |
Suli Darlaghat monthly report of bio medical waste for the month of Aug ,Sep and Oct 2020 |
November 08, 2020 |
 |
Gajambuja plant Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to September 2020 |
November 03, 2020 |
 |
CPP (3X30 MW) Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to September 2020 |
November 03, 2020 |
 |
BCT Port Muldwarka Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to September 2020 |
November 03, 2020 |
 |
BCT RO Plant Muldwarka Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to September 2020 |
November 03, 2020 |
 |
Vadanagar Limestone Mine Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to September 2020 |
November 03, 2020 |
 |
Sugala Limestone Mines Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to Septmber 2020 |
November 03, 2020 |
 |
RKBA Limestone Mines Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to Septmber 2020 |
November 03, 2020 |
 |
Singsar Limestone Mines Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to Septmber 2020 |
November 03, 2020 |
 |
Lodhva Limestone Mines Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to Septmber 2020 |
November 03, 2020 |
 |
Solaj Limestone Mines Ambujanagar Unit Half Yearly EC Compliance Report for April 2020 to Septmber 2020 |
November 03, 2020 |
 |
BMW Generation Report - October 2020 of Ropar Unit |
November 01, 2020 |
 |
ACL Ropar -Environmental Statement (2019-2020) |
September 28, 2020 |
 |
Ropar Unit BMW generation report August 2020 |
September 01, 2020 |
 |
Ropar - Half Yearly EC Compliance Report _ ( 1 Jan 2020 - 30 June 2020) |
August 17, 2020 |
 |
Suli Darlaghat monthly report of Bio-Medical Waste July 2020 |
August 08, 2020 |
 |
Gare Palma Coal Mines-IV8-EC Compliance-Jan-June 2020 |
August 04, 2020 |
 |
MCW Biomedical Waste Data - July 2020 |
August 04, 2020 |
 |
MCW Fly ash report - July 2020 |
August 04, 2020 |
 |
BMW Generation Report - July 2020 of Ropar Unit |
August 01, 2020 |
 |
MCW Biomedical Waste Data - JUNE 2020 |
July 04, 2020 |
 |
MCW Fly Ash Report for June 2020 |
July 04, 2020 |
 |
BCT Mangalore-CRZ Clearance-Compliance Report Oct 2019 -March 2020 |
June 30, 2020 |
 |
Sankrail GU- Environment statement report 2019-20 |
June 24, 2020 |
 |
Rauri Monthly Report May 2020 |
June 08, 2020 |
 |
Suli Plant Monthly Report May 2020 |
June 08, 2020 |
 |
Sankrail GU-Six monthly EC compliance report (Oct'19 to Mar'20) |
June 05, 2020 |
 |
Rauri 2.6 Six monthy EC Compliance Oct 2019 to Mar 2020 |
May 28, 2020 |
 |
Kashlog Mines 5.5 to 7.6 Six montly EC complaince Oct 2019-Mar 2020 |
May 28, 2020 |
 |
Kashlog Mines 3.3 to 5.5 Six montly EC complaince Oct 2019-Mar 2020 |
May 28, 2020 |
 |
Rauri MoEF Six monthly Compliance 1.8 Oct 2019 to mar 2020 |
May 28, 2020 |
 |
Suli Plant MoEF Six monthly compliance Oct 2019 to Mar 2020 |
May 25, 2020 |
 |
Farakka GU-Six Monthly EC Compliance Report_Oct'19 to March'20 |
May 25, 2020 |
 |
Nalagarh Unit Half Yearly Compliance Report of Environment Clearance for October 2019 to March 2020 |
May 21, 2020 |
 |
Ambuja Hospital - Ambujanagar -Annual Reports (From-IV) for Bio Medical Waste for 2019 |
May 19, 2020 |
 |
Bhatapara Plant Half Yearly EC Compliance Report - Oct 2019-Mar 2020 |
May 18, 2020 |
 |
Bhatapara Rawan Limestone Mines Half Yearly EC Compliance Report- Oct 19-Mar 2020 |
May 18, 2020 |
 |
Bhatapara-Maldi-Mopar Limestone Mines- Half Yearly EC Compliance Report-Oct.19-March 2020 |
May 18, 2020 |
 |
Nalagarh Grinding Unit-EC for Production Capacity Enhancement (1.5 to 2.2 MTPA) |
April 28, 2020 |
 |
BMW Report Suli Darlaghat Jan and Feb 2020 |
March 07, 2020 |
 |
MCW Fly Ash report - Feb 2020 |
March 04, 2020 |
 |
MCW Biomedical waste data - Feb 2020 |
March 02, 2020 |
 |
BMW generation report-February-2020 of Ropar Unit |
March 01, 2020 |
 |
Gare Palma Coal Washery-EC Compliance Report-July-Dec 2019 |
February 24, 2020 |
 |
BMW Generation Report January 2020 of Ropar Unit |
February 01, 2020 |
 |
Half Yearly Environmental Compliance Report Ropar ( 1 July 2019 - 31 December 2019) |
January 20, 2020 |
 |
MCW Fly Ash Report Dec 2019 |
January 04, 2020 |
 |
BMW generation report-December-2019 of Ropar Unit |
January 01, 2020 |
 |
Biomedical waste report for Dec 2019 |
December 31, 2019 |
 |
MCW-Flyash-report-Nov2019 |
December 04, 2019 |
 |
BMW Generation Report of MCW for November 2019 |
December 01, 2019 |
 |
BMW Generation Report of Ropar Unit for November 2019 |
December 01, 2019 |
 |
MCW-Six-monthly-EC-compliance-report-of-Limestone-mine-MLII-Apr19-Sept19 |
November 28, 2019 |
 |
MCW-Six-monthly-EC-compliance-report-of-Limestone-mine-MLI-Apr19-Sept19 |
November 28, 2019 |
 |
MCW Six monthly EC compliance report of Cement Plant and CPP Apr19-Sept19 |
November 28, 2019 |
 |
MCW-Six-monthly-EC-compliance-report-of-Limestone-mine-MLIII-Apr19-Sept19 |
November 28, 2019 |
 |
Farakka Six Monthly Compliance report for the period April'19 to Sept'19 |
November 25, 2019 |
 |
Vadnagar-Mines-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
Sugala-Mines-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
SOLAJ-Mines-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
RKBA-Mines-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
Lodhva-Mines-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
GajAmbuja-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
BCT-Muldwarka-RO-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
BCT-Muldwarka-Port-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
Ambujanagar-TPP-Six-Monthly-Compliance-Report-Apr-Sept2019 |
November 25, 2019 |
 |
Half Yearly Compliance Report of Environment Clearance for Nalagarh Unit Apr' 2019 to Sept' 2019 |
November 11, 2019 |
 |
Ropar Bio Medical Waste Report Oct 2019 |
November 01, 2019 |
 |
Suli Bio Medical Waste Report Oct 2019 |
October 31, 2019 |
 |
BMW Generation report - September 2019 of Ropar Unit |
October 01, 2019 |
 |
Ropar Unit Annual Environmental Statement Report 2018-2019 |
September 25, 2019 |
 |
Annual Environment Statement for FY 2018-2019 of Sankrail |
September 03, 2019 |
 |
BMW Generation Report of Ropar Unit July 2019 |
August 01, 2019 |
 |
MCW Six monthly EC compliance report of Cement Plant and CPP - Oct 2018 to Mar 2019 |
July 12, 2019 |
 |
MCW Six monthly EC compliance report of Limestone mine ML I - Oct-2018 to Mar-2019 |
July 12, 2019 |
 |
MCW Six monthly EC compliance report of Limestone mine ML II - Oct-2018 to Mar-2019 |
July 12, 2019 |
 |
MCW Six monthly EC compliance report of Limestone mine ML III - Oct-2018 to Mar-2019 |
July 12, 2019 |
 |
EC compliance status of BCT-Mangalore Oct 2018 - March 2019 |
June 28, 2019 |
 |
Half Yearly EC Compliance Report of Ropar Unit (Jan 2019 - June 2019) |
June 27, 2019 |
 |
Ropar Bio Medical Waste Generation May 2019 |
June 11, 2019 |
 |
MoEF Compliance 5.5 Kashlog Mines - Oct 2018 to Mar 2019 |
May 30, 2019 |
 |
Compliance MoEF 1.8 MTPA Rauri - Oct2018-March2019 |
May 30, 2019 |
 |
Compliance MoEF 7.6 Kashlog Mines - Oct 2018 to March 2019 |
May 30, 2019 |
 |
Compliance MoEF 2.6 Rauri Plant - Oct 2018 to March 2019 |
May 30, 2019 |
 |
EC Compliance Suli-Oct 2018 to March 2019 |
May 30, 2019 |
 |
Farakka-Half yearly (Oct'18-Mar'19) EC Compliance Report |
May 23, 2019 |
 |
Nalagarh Half Yearly EC Compliance report Oct'18-Mar'19 |
May 07, 2019 |
 |
MCW Fly ash report - April 2019 |
May 04, 2019 |
 |
Ropar Bio medical waste generation April-19 |
April 30, 2019 |
 |
MCW Biomedical Waste Data - April 2019 |
April 30, 2019 |
 |
Farakka-Half yearly (April'18-Sept'18) EC Compliance Report |
November 21, 2018 |
 |
Half yearly compliance report of Environment Clearance April 2017 to September 2018 |
November 01, 2018 |
 |
Bio-Medical Waste Report Aug to Oct 2018 |
October 31, 2018 |
 |
Half Yearly Compliance Report of Nalagarh Plant, Apr 2018 to Sep 2018 |
September 30, 2018 |
 |
Bio-Medical Waste Monthly Report of Darlaghat - September 2018 |
September 30, 2018 |
 |
Environment Statement Report for the year 2017-2018 - Sankrail |
September 20, 2018 |
 |
Bio-Medical Waste Monthly Report of Darlaghat - August 2018 |
September 03, 2018 |
 |
Bio-Medical Waste Report of MCW, Jan to July 2018 |
July 31, 2018 |
 |
Half Yearly Compliance Report of Maldi Mopar Mines at Bhatapara Plant, October 2017 to March 2018 |
June 30, 2018 |
 |
Half Yearly Compliance Report of Rawan Mines at Bhatapara, October 2017 to March 2018 |
June 30, 2018 |
 |
Half Yearly Compliance Report of Bhatapara Plant, October 2017 to March 2018 |
June 30, 2018 |
 |
Bio medical waste generation June 2018 for Ropar |
June 30, 2018 |
 |
Half Yearly Environmental Clearance Compliance Report for October 2017 - March 2018, Sankrail |
June 23, 2018 |
 |
Bio medical waste generation May 2018 report for Darlaghat |
May 31, 2018 |
 |
Bio medical waste generation May 2018 for Ropar |
May 31, 2018 |
 |
Environment clearance letter for Sankrail expansion 1.5 MTPA to 2.4 MTPA |
May 09, 2018 |
 |
Status of Compliance against EC April 2017 to Sept 2017 |
May 09, 2018 |
 |
Environment Monitoring Data April 2017 to Sept 2017 |
May 09, 2018 |
 |
Environmental Monitoring Report March 2018 Nalagarh Plant |
March 31, 2018 |
 |
Half yearly compliance report of Environment Clearance Oct 2017 to March 2018 |
March 31, 2018 |
 |
Half yearly compliance report of Environment Clearance Oct 2017 to March 2018. |
March 31, 2018 |
 |
Environmental Monitoring Report March 2018 |
March 31, 2018 |
 |
Bio-Medical Waste Report of Darlaghat, March 2018 |
March 31, 2018 |
 |
Half yearly compliance report of Environment Clearance October 2017 to March 2018 |
March 24, 2018 |
 |
Environmental Monitoring Report February 2018 Nalagarh Plant |
February 28, 2018 |
 |
Environmental Monitoring Report February 2018 |
February 28, 2018 |
 |
Bio-Medical Waste Report of Darlaghat, February 2018 |
February 28, 2018 |
 |
Environmental Monitoring Report January 2018 Nalagarh Plant |
January 31, 2018 |
 |
Environmental Monitoring Report January 2018 |
January 31, 2018 |
 |
Bio-Medical Waste Report of Ropar, January 2018 |
January 31, 2018 |
 |
Bio-Medical Waste Report of Darlaghat, January 2018 |
January 31, 2018 |
 |
Compliance of Recommendations by the Expert Committee for Suli, September 2017 |
January 10, 2018 |
 |
Half Yearly Environmental Clearance Compliance Status Report of Suli (April - Sept 2017) |
January 10, 2018 |
 |
Half Yearly Environmental Clearance Compliance Report of Suli with Covering letter, tables and annexures |
January 10, 2018 |
 |
Compliance status report of Environmental Clearance for Suli plant (2.0 MTPA to 2.6 MTPA) |
January 10, 2018 |
 |
Consent Compliance of Suli Plant September 2017 |
January 10, 2018 |
 |
Compliance status report of Environmental Clearance for Rauri plant (1.8MTPA – 2.6 MTPA) (April- Sept 2017) |
January 10, 2018 |
 |
Compliance status report of Environmental Clearance for Kashlog mines (5.5 MTPA to 7.6 MTPA), Rauri (April- Sept 2017) |
January 10, 2018 |
 |
Compliance status report of Environmental Clearance for Kashlog mines, Rauri plant (April- Sept 2017) |
January 10, 2018 |
 |
Compliance status report of Environmental Clearance for Rauri 1.8 plant (April - Sept 2017) |
January 09, 2018 |
 |
Monthly Monitoring Report of Darlaghat, December 2017 |
December 31, 2017 |
 |
Bio-Medical Waste Report of Darlaghat, December 2017 |
December 31, 2017 |
 |
Bio-Medical Waste Report of Ropar, December 2017 |
December 31, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Thermal Power Plant |
December 16, 2017 |
 |
Consent Conditions Suli Plant Valid up to 31st March 2018 |
December 16, 2017 |
 |
Monthly Monitoring Report of Suli - November 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Suli - October 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Suli - September 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Suli - August 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Suli - July 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Suli - June 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Rauri, June 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Rauri, July 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Rauri, November 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Rauri, October 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Rauri, September 2017 |
December 16, 2017 |
 |
Monthly Monitoring Report of Rauri, August 2017 |
December 16, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Lodhva Limestone Mines (April to Sept 2017) |
December 16, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of RKBA Limestone Mines (April to Sept 2017) |
December 16, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Singsar Limestone Mines (April to Sept 2017) |
December 16, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Solaj Limestone Mines (April to Sept 2017) |
December 16, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Sugala Limestones (April to Sept 2017) |
December 16, 2017 |
 |
Six Monthly Compliance Status Report of Environmental Clearance of Vadnagar (April to Sept 2017) |
December 16, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Gajambuja (April - Sept 2017) |
December 16, 2017 |
 |
Six Monthly Compliance Status Report of Environmental Clearance (MoST) and CRZ Bulk Cement Terminal (April to Sept 2017) |
December 16, 2017 |
 |
Half Yearly EC Compliance Status Report of CRZ Clearance for RO Plant (April - September 2017) |
December 16, 2017 |
 |
Bio-Medical Waste Report of Ropar, November 2017 |
December 01, 2017 |
 |
Bio-Medical Waste Report of MCW, Aug to Nov 2017 |
November 30, 2017 |
 |
Half Yearly Report of Plant and Mines at MCW plant April to September 2017 |
November 27, 2017 |
 |
Half Yearly Environmental Clearance Compliance Report for April 2017 - September 2017, Sankrail |
November 22, 2017 |
 |
Monthly Monitoring Report of Bhatapara for October 2017 |
October 31, 2017 |
 |
Environmental Monitoring Report of Nalagarh September 2017 |
October 31, 2017 |
 |
Half Yearly Compliance of Environment Clearance Report -April 2017 to September 2017, Nalagarh |
October 31, 2017 |
 |
Bio-Medical Waste Report of Darlaghat, October 2017 |
October 31, 2017 |
 |
Bio-Medical Waste Report of Ropar, October 2017 |
October 31, 2017 |
 |
Sankrail Environment Statement for the Year 2016-2017 |
October 30, 2017 |
 |
Sankrail Ambient data April 2017 to September 2017 |
September 30, 2017 |
 |
Monthly Monitoring Report of Bhatapara, September 2017 |
September 30, 2017 |
 |
Bio-Medical Waste Report of Ropar, September 2017 |
September 30, 2017 |
 |
Bio-Medical Waste Report of Darlaghat, September 2017 |
September 30, 2017 |
 |
Annual Environment Statement of Bhatapara for the year 2016 - 2017 |
September 14, 2017 |
 |
Environmental Monitoring Report of Nalagarh , August 2017 |
August 31, 2017 |
 |
Bio-Medical Waste Report of Ropar, August 2017 |
August 31, 2017 |
 |
Environmental Monitoring Report of Nalagarh , July 2017 |
July 31, 2017 |
 |
Biomedical Waste Report of MCW for July 2017 |
July 31, 2017 |
 |
Monthly Monitoring Report of Bhatapara, July 2017 |
July 31, 2017 |
 |
Half Yearly Environment Clearance Compliance Report (Part-02), Ropar |
July 29, 2017 |
 |
Half Yearly Environment Clearance Compliance Report (Part-01), Ropar |
July 29, 2017 |
 |
Environmental Monitoring Report of Nalagarh , June 2017 |
June 30, 2017 |
 |
Monthly Report of Bio-Medical Waste of Darlaghat for, June 2017 |
June 30, 2017 |
 |
Monthly Monitoring Report of Bhatapara, June 2017 |
June 30, 2017 |
 |
Monthly Report of Bio-Medical Waste of Darlaghat for, May 2017 |
May 31, 2017 |
 |
Monthly Monitoring Report Suli Plant, May 2017 |
May 31, 2017 |
 |
Monthly Monitoring Report Rauri Plant, May 2017 |
May 31, 2017 |
 |
Environmental Monitoring Report May, 2017 Nalagarh |
May 31, 2017 |
 |
Monthly Monitoring Report Suli Plant, April 2017 |
April 30, 2017 |
 |
Monthly Monitoring Report Rauri Plant, April 2017 |
April 30, 2017 |
 |
Environmental Monitoring Report April, 2017 Nalagarh |
April 30, 2017 |
 |
Monthly Report of Bio-Medical Waste for April, 2017 |
April 30, 2017 |
 |
Sankrail ambient data January - March 2017 |
April 30, 2017 |
 |
Monthly Monitoring Report of Bhatapara April, 2017 |
April 30, 2017 |
 |
Quarterly Report of Bio-Medical Waste for Ropar unit |
April 30, 2017 |
 |
Half Yearly Environmental Clearance Compliance report of MCW |
March 31, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance of Thermal Power Plant at Ambujanagar |
March 31, 2017 |
 |
Half Yearly Environmental Clearance Compliance status of Singsar Limestone Mines |
March 31, 2017 |
 |
Half Yearly Environmental Clearance Compliance status of Solaj Limestone Mines |
March 31, 2017 |
 |
Half Yearly Environmental Clearance Compliance status of Sugala Limestone Mines |
March 31, 2017 |
 |
Half Yearly Environmental Clearance Compliance status of Vadnagar Limestone Mines |
March 31, 2017 |
 |
Half Yearly Environmental Clearance Compliance status of RKBA Limestone Mines |
March 31, 2017 |
 |
Half Yearly Compliance Status Report of Environmental Clearance (MOST) and CRZ at Muldwarka |
March 31, 2017 |
 |
Half Yearly Environmental Clearance Compliance status of Gajambuja Cement Plant |
March 31, 2017 |
 |
Half Yearly Compliance Status Report of CRZ Clearance of RO plant at Muldwarka |
March 31, 2017 |
 |
Half Yearly EC Compliance of Lodhva Limestone Mines |
March 31, 2017 |
 |
Six monthly MoEF Compliance status for Rauri and Kashlog Mines, October 2016 to March 2017 |
March 31, 2017 |
 |
Six monthly MoEF Compliance status for Rauri and Kashlog Mines MTPA October 2016 to March 2017 |
March 31, 2017 |
 |
Half Yearly compliance of MoEF Clearance for Suli Plant, October to March 2017 |
March 31, 2017 |
 |
Monthly Monitoring Report Suli Plant, March 2017 |
March 31, 2017 |
 |
Monthly Monitoring Report Rauri Plant, March 2017 |
March 31, 2017 |
 |
Half Yearly Compliance Report of Rawan Mines at Bhatapara, October to March 2017 |
March 31, 2017 |
 |
Half Yearly Compliance Report of Bhatapara Plant, October to March 2017 |
March 31, 2017 |
 |
Half Yearly Compliance Report of Maldi Mopar Mines at Bhatapara Plant, October to March 2017 |
March 31, 2017 |
 |
Half Yearly Compliance of Environment Clearance, October 2016 to March 2017 of Nalagarh |
March 31, 2017 |
 |
Environmental Monitoring Report March, 2017 Nalagarh |
March 31, 2017 |
 |
Monthly Report of Bio-Medical Waste for March, 2017 |
March 31, 2017 |
 |
Monthly Monitoring Report of Bhatapara March, 2017 |
March 31, 2017 |
 |
Environmental Monitoring Report February, 2017 Nalagarh |
February 28, 2017 |
 |
Monthly Monitoring Report of Bhatapara February, 2017 |
February 28, 2017 |
 |
Biomedical Waste Report of Darlaghat for February 2017 |
February 28, 2017 |
 |
Environmental Monitoring Report January, 2017 Nalagarh |
January 31, 2017 |
 |
Monthly Monitoring Report of Bhatapara January, 2017 |
January 31, 2017 |
 |
Biomedical Waste Report of Darlaghat for January 2017 |
January 31, 2017 |
 |
Annual Biomedical Waste Report of Darlaghat for the year 2016 |
January 17, 2017 |
 |
Environmental Monitoring Report November, 2016 Nalagarh |
November 30, 2016 |
 |
Half Yearly Compliance Status Report of Environmental clearance of Singsar Limestone |
November 24, 2016 |
 |
Environmental Monitoring Report October 2016 Nalagarh |
October 31, 2016 |
 |
Half Yearly compliance of Environment Clearance - report of Nalagarh unit |
October 26, 2016 |
 |
Six Monthly Report for the period April 2016 to Sept 2016 |
September 30, 2016 |
 |
Environment Statement for the year 2015-16 |
September 27, 2016 |
 |
Environment Data for the period April 2016 to Sept 2016 |
September 26, 2016 |
 |
Monthly Monitoring Report for Nalagarh - September 2016 |
September 25, 2016 |
 |
Monthly Monitoring Report for Suli August 2016 |
August 31, 2016 |
 |
Monthly Monitoring Report for Bhatapara - August 2016 |
August 24, 2016 |
 |
Monthly Monitoring Report Bhatapara July 2015 |
July 31, 2016 |
 |
Monthly Monitoring Report for Nalagarh - July 2016 |
July 31, 2016 |
 |
Monthly Monitoring Report for Bhatapara - July 2016 |
July 28, 2016 |
 |
Environmental Monitoring Report for June 2016 Nalagarh |
June 26, 2016 |
 |
Monthly Monitoring Report for Bhatapara June |
June 22, 2016 |
 |
Monthly Monitoring Bhatapara Report for May 2016 |
May 31, 2016 |
 |
Environmental Monitoring Report for May 2016 Nalagarh |
May 31, 2016 |
 |
Environment Clearance of Lodhva Limestone Mine - Ambujanagar Unit |
May 26, 2016 |
 |
Environment Clearance letter of Cement Grinding at Ropar |
May 26, 2016 |
 |
Monthly Report Bhatapara Plant March 2016 |
May 02, 2016 |
 |
Monthly Monitoring Report for April 2016 |
April 30, 2016 |
 |
Environmental Monitoring Report for April 2016 Nalagarh |
April 30, 2016 |
 |
Monthly Report Rauri Plant March 2016 |
March 31, 2016 |
 |
Monthly report Suli Plant March 2016 |
March 31, 2016 |
 |
Environmental Monitoring Report March 2016 Nalagarh |
March 31, 2016 |
 |
Sankrail Ambient Data March 2016 |
March 31, 2016 |
 |
Monthly Report Rauri Plant February 2016 |
February 29, 2016 |
 |
Monthly report Suli Plant February 2016 |
February 29, 2016 |
 |
Environmental Monitoring Report February 2016 Nalagarh |
February 29, 2016 |
 |
Monthly Report Bhatapara Plant February 2016 |
February 29, 2016 |
 |
Sankrail Ambient Data February 2016 |
February 29, 2016 |
 |
Monthly Report Rauri Plant January 2016 |
January 31, 2016 |
 |
Monthly Report Suli January 2016 |
January 31, 2016 |
 |
Environmental Monitoring Report January 2016 Nalagarh |
January 31, 2016 |
 |
Monthly Report Bhatapara Plant January 2016 |
January 31, 2016 |
 |
Sankrail Ambient Data January 2016 |
January 31, 2016 |
 |
Monthly report Suli Plant December 2015 |
December 31, 2015 |
 |
Transfer of EC of GareIV 8 MoEFCC Letter 10.06.15 |
December 31, 2015 |
 |
Environmental Monitoring Report December 2015 Nalagarh |
December 31, 2015 |
 |
Sankrail Ambient Data December 2015 |
December 31, 2015 |
 |
Ambuja Maldi Mopar Mine Compliance April 2015 September 2015 |
December 29, 2015 |
 |
Ambuja Rawan Mines Compliance April 2015 September 2015 |
December 19, 2015 |
 |
Environmental Monitoring Report November 2015 Nalagarh |
November 30, 2015 |
 |
Sankrail Ambient Data November 2015 |
November 30, 2015 |
 |
Half Yearly Compliance Status Report of CRZ Clearance of RO plant at Muldwaraka |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance MoST Environmental clearance CRZ |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance of Gajambuja |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance of RKBA Limestone |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance of Solaj Mines |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance of Sugala Limestone Mines |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance of Vadnagar Limestone Mines |
November 24, 2015 |
 |
Half Yearly Compliance Status Report of Environmental clearance of TPP at Ambujanagar |
November 24, 2015 |
 |
Environmental Monitoring Report October 2015 Nalagarh |
October 31, 2015 |
 |
Sankrail Ambient Data October 2015 |
October 31, 2015 |
 |
Half Yearly compliance of MoEF Clearance Ambuja Cements Ltd Nalagarh H.P. |
October 21, 2015 |
 |
Monthly Monitoring Report Bhatapara September 2015 |
September 30, 2015 |
 |
Environmental Monitoring Report September 2015 Nalagarh |
September 30, 2015 |
 |
Sankrail Ambient Data September 2015 |
September 30, 2015 |
 |
EC Letter Expn of Rauri |
September 15, 2015 |
 |
EC of Kashlog Limestone Mines Expansion |
September 08, 2015 |
 |
Monthly Monitoring Report Bhatapara August 2015 |
August 31, 2015 |
 |
Monthly Monitoring Report Rauri August 2015 |
August 31, 2015 |
 |
Monthly Monitoring Report Suli August 2015 |
August 31, 2015 |
 |
Environmental Monitoring Report August 2015 Nalagarh |
August 31, 2015 |
 |
Sankrail Ambient Data August 2015 |
August 31, 2015 |
 |
Monthly Monitoring Report Rauri July 2015 |
July 31, 2015 |
 |
Monthly Monitoring Report Suli July 2015 |
July 31, 2015 |
 |
Environmental Monitoring Report July 2015 Nalagarh |
July 31, 2015 |
 |
Environmental Monitoring Report June 2015 Nalagarh |
June 30, 2015 |
 |
Sankrail Ambient data June 2015 |
June 30, 2015 |
 |
Sankrail Ambient data July 2015 |
June 30, 2015 |
 |
Half yearly compliance Suli October 2014 March 2015 |
June 01, 2015 |
 |
MoEF compliance Rauri Plant October 14 to March 15 |
June 01, 2015 |
 |
Monthly report Suli plant May, 2015 |
May 31, 2015 |
 |
Monthly report Rauri plant May, 2015 |
May 31, 2015 |
 |
Monthly monitoring report May 2015 - ACL, Bhatapara |
May 31, 2015 |
 |
Environmental Monitoring Report May 2015 Nalagarh |
May 31, 2015 |
 |
Sankrail Ambient data May 2015 |
May 31, 2015 |
 |
Gajambuja Unit EC Compliance (Oct 13 to Mar 14) |
May 25, 2015 |
 |
Monthly monitoring report April 15- ACL, Bhatapara |
April 30, 2015 |
 |
Environmental Monitoring Report April 2015 Nalagarh |
April 30, 2015 |
 |
Sankrail Ambient data April 2015 |
April 30, 2015 |
 |
Environmental Monitoring Report March 2015 Nalagarh |
March 31, 2015 |
 |
Half yearly Compliance of Environmental Clearance-Nalagarh-October 2014 to March 2015 |
March 31, 2015 |
 |
Ambuja Rawan Mine Compliance October14 March 15 |
March 31, 2015 |
 |
Ambuja Maldi Mopar Mine Compliance October 14 to March 15 |
March 31, 2015 |
 |
Ambuja Cement Bhatapara Plant Compliance October 14 to March 15 |
March 31, 2015 |
 |
Environment Statement for the year 2014-2015 |
March 31, 2015 |
 |
Monthly monitoring report February 15- ACL, Bhatapara |
February 28, 2015 |
 |
Monthly report Suli Plant-Feb 15 |
February 28, 2015 |
 |
Monthly Report Rauri Plant Feb 15 |
February 28, 2015 |
 |
Environmental Monitoring Report February 2015 Nalagarh |
February 28, 2015 |
 |
Monthly monitoring report January 15- ACL, Bhatapara |
January 31, 2015 |
 |
Environmental Monitoring Report January 2015 Nalagarh |
January 31, 2015 |
 |
Environmental Monitoring Report November 2014 Nalagarh |
December 31, 2014 |
 |
Environmental Monitoring Report December 2014 Nalagarh |
December 31, 2014 |
 |
Monthly monitoring report December-14 - ACL, Bhatapara |
December 31, 2014 |
 |
Monthly report Suli Plant-December 14 |
December 31, 2014 |
 |
Monthly Report Rauri Plant December 2014 |
December 31, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for the month of December 2014 |
December 31, 2014 |
 |
Environmental Monitoring Report - November 2014 - Bhatapara |
November 30, 2014 |
 |
EC Compliance of RKBA (April to Sept 2014) |
November 20, 2014 |
 |
EC Compliance BCT RO CRZ (April to Sept 2014) |
November 20, 2014 |
 |
EC Compliance Gajambuja Unit (April to Sept 2014) |
November 20, 2014 |
 |
EC Compliance of S.No 44 (April to Sept 2014) |
November 20, 2014 |
 |
EC Compliance of Solaj (April to Sept 2014) |
November 20, 2014 |
 |
EC Compliance of sugala (April to Sept 2014) |
November 20, 2014 |
 |
EC Compliance of TPP (April to Sept 2014) |
November 20, 2014 |
 |
Environmental Monitoring Report October 2014 Nalagarh |
October 31, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for the month of September 2014 |
September 30, 2014 |
 |
Half Yearly Compliance of Environmental clearance - April 2014 to September 2014 |
September 30, 2014 |
 |
Environmental Monitoring Report - September 2014 - Nalagarh |
September 30, 2014 |
 |
Environment statement Vadnagar mines - 2014 |
September 16, 2014 |
 |
Environment statement TPP - 2014 |
September 16, 2014 |
 |
Environment statement Sugala mines - 2014 |
September 16, 2014 |
 |
Environment statement Solaj mines - 2014 |
September 16, 2014 |
 |
Environment statement RKBA mines - 2014 |
September 16, 2014 |
 |
Environment statement Gaj Ambuja plant - 2014 |
September 16, 2014 |
 |
Environment statement Ambuja plant-2014 |
September 16, 2014 |
 |
Environment statement BCT-2014 |
September 16, 2014 |
 |
Half Yearly compliance report Cement Plant Mines - Rabriyawas (Part-1) |
June 30, 2014 |
 |
Half Yearly compliance report Cement Plant Mines Rabriyawas (Part-2) |
June 30, 2014 |
 |
Compliance of conditions by moef for the expansion of Kashlog limestone mines of Ambuja Cements Limited oct 13 to mar 14 |
June 30, 2014 |
 |
Compliance of specific & general conditions imposed by the moef for Rauri plant |
June 30, 2014 |
 |
Compliance Rauri Plant EC Ammended |
June 30, 2014 |
 |
Suli Compliance Expertcommittee Oct 2013 to Mar 2014 |
June 30, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for the month of June 2014 |
June 30, 2014 |
 |
Monthly Report Rauri Plant June 2014 |
June 29, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for the month of June 2014 |
June 29, 2014 |
 |
Monthly Report Suli Plant June 2014 |
June 28, 2014 |
 |
Environmental Monitoring Report June2014 Nalagarh |
June 28, 2014 |
 |
Half yearly compliance report from October-13 to March-14 - Bhatapara |
May 31, 2014 |
 |
Monthly monitoring report May-14, ACL Bhatapara |
May 31, 2014 |
 |
Environmental Monitoring Report May 2014 Nalagarh |
May 31, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for May 2014 |
May 30, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for May 2014 |
May 29, 2014 |
 |
Monthly Report Rauri Plant May 2014 |
May 28, 2014 |
 |
Monthly Report Suli Plant May 2014 |
May 28, 2014 |
 |
BCT RO Plant EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
CPP EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
RKBA EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
S.N.44 EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
Singsar Mines EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
Solaj Mines EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
Sugala Mines EC Compliance (Oct 13 to Mar 14) |
May 25, 2014 |
 |
Environmental Monitoring Report - April 2014 - Nalagarh |
April 30, 2014 |
 |
Environmental Monitoring Report March 2014 Nalagarh |
April 30, 2014 |
 |
Environmental Monitoring Report - February 2014 - Nalagarh |
April 30, 2014 |
 |
Environmental Monitoring Report - January 2014 - Nalagarh |
April 30, 2014 |
 |
Environmental Monitoring Report December 2013 - Nalagarh |
April 30, 2014 |
 |
Monthly Report Bhatapara Plant April 2014 |
April 30, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for April 2014 |
April 29, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for April 2014 |
April 29, 2014 |
 |
Monthly Report Rauri Plant April 2014 |
April 28, 2014 |
 |
Monthly Report Suli Plant April 2014 |
April 28, 2014 |
 |
Monthly Report Bhatapara Plant March 2014 |
March 30, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for March 2014 |
March 30, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for March 2014 |
March 29, 2014 |
 |
Monthly Report Rauri Plant March 2014 |
March 28, 2014 |
 |
Monthly Report Suli Plant March 2014 |
March 28, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for February 2014 |
February 28, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for February 2014 |
February 28, 2014 |
 |
Monthly Report Rauri Plant February 2014 |
February 28, 2014 |
 |
Monthly Report Suli Plant February 2014 |
February 28, 2014 |
 |
Daily Average values of CEMS - installed at Suli Plant for January 2014 |
January 31, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant for January 2014 |
January 31, 2014 |
 |
Monthly Report Suli Plant January 2014 |
January 31, 2014 |
 |
Monthly Report Rauri Plant January 2014 |
January 31, 2014 |
 |
Daily Average values of CEMS - installed at Rauri Plant |
December 31, 2013 |
 |
Daily Average values of CEMS - installed at Suli Plant |
December 31, 2013 |
 |
Monthly report Suli Plant - December 2013 |
December 30, 2013 |
 |
MOEF Compliance June - Nov 2013, Nalagarh Unit |
November 30, 2013 |
 |
Environmental Monitoring Report November 2013 Nalagarh |
November 29, 2013 |
 |
Environmental Monitoring Report October 2013 Nalagarh |
October 31, 2013 |
 |
Monthly report - Suli Plant Sep-2013 |
September 30, 2013 |
 |
Environmental Monitoring Report September 2013 Nalagarh |
September 30, 2013 |
 |
Monthly Report Rauri September 2013 |
September 29, 2013 |
 |
MMR September-2013, ACL, Bhatapara |
September 27, 2013 |
 |
Environmental Monitoring Report August 2013 Nalagarh |
August 31, 2013 |
 |
Monthly monitoring report for August-13, ACL Bhatapara |
August 29, 2013 |
 |
Environmental Monitoring Report July 2013 Nalagarh |
July 31, 2013 |
 |
Environmental Monitoring Report June 2013 Nalagarh |
June 30, 2013 |
 |
Compliance of conditions-MoEF for Rauri Plant |
June 28, 2013 |
 |
Compliance of conditions - MoEF for Kashlog Limestone mines |
June 27, 2013 |
 |
Compliance of Conditions laid down by MoEF for Expansion _2.0 |
June 26, 2013 |
 |
Daily Average values of CEMS - installed at Rauri Plant - Dec 2012 |
December 31, 2012 |
 |
Daily Average values of CAAQMS - Darlaghat for December 2012 |
December 18, 2012 |
 |
Daily Average values of CEMS - installed at Suli Plant - Dec 2012 |
December 18, 2012 |
 |
Daily Average values of CEMS - installed at Suli Plant - Nov 201 |
November 30, 2012 |
 |
Monthly Report Suli Plant for the November 2012 |
November 30, 2012 |
 |
Monthly Report Rauri Plant for November 2012 |
November 30, 2012 |
 |
Daily Average values of CAAQMS - Darlaghat for November 2012 |
November 13, 2012 |
 |
Daily Average values of CEMS - installed at Rauri Plant - Nov 2012 |
November 13, 2012 |
 |
Monthly report Suli Plant for the month of October 2012 |
October 31, 2012 |
 |
Monthly Report Rauri Plant for the month of October 2012 |
October 30, 2012 |
 |
Amended EC Rauri 16 Oct. 2012 |
October 16, 2012 |
 |
Daily report of CEMS - installed at Rauri Plant 30-12-2011 |
December 30, 2011 |
 |
Daily report of CEMS - installed at Suli Plant - 30-12-2011 |
December 30, 2011 |
 |
Daily report of CAAQMS - Darlaghat 29-12-2011 |
December 29, 2011 |
 |
Daily report of CEMS - installed at Suli Plant - 29-12-2011 |
December 29, 2011 |
 |
Daily report of CAAQMS - Darlaghat 28-12-2011 |
December 28, 2011 |
 |
Daily report of CEMS - installed at Suli Plant - 28-12-2011 |
December 28, 2011 |
 |
Daily report of CEMS - installed at Suli Plant - 27-12-2011 |
December 27, 2011 |
 |
Maratha cement works Online Stack emmission data Dec 2010 |
December 31, 2010 |
 |
Maratha cement works Online Ambient Air Quality Dec 2010 |
December 30, 2010 |
 |
Maratha Cement works Online stack emmision data Nov 2010 |
November 30, 2010 |
 |
Maratha cement works Online Ambient Air Quality Nov 2010 |
November 29, 2010 |
 |
Environmental Monitoring Report October 2010 - Nalagarh |
October 31, 2010 |
 |
Maratha cement works Online Ambient Air Quality Oct 2010 |
October 30, 2010 |
 |
Monthly Report Suli October 2010 |
October 29, 2010 |
 |
Maratha cement works Online Stack emmission data Oct 2010 |
October 29, 2010 |
 |
Monthly Report Rauri October 2010 |
October 28, 2010 |
 |
Environmental Monitoring Report September 2010 Nalagarh |
September 30, 2010 |
 |
Environment Monthly data for November 2009 |
November 30, 2009 |
 |
Ambient Air Monitoring data of November 2009 |
November 29, 2009 |
 |
Ambient Air Monitoring data of October 2009 |
October 31, 2009 |
 |
Environment Monthly data for October 2009 |
October 31, 2009 |
 |
Ras-2 Mine- Environment Clearance |
October 10, 2007 |
 |
Sonapur-Thutra-EC-MLIII-060105 |
January 06, 2005 |
 |